The drilling program Continues Power Plant
May 23,2025
![]() |
||
![]() |
![]() |
![]() |
The power station of the 5000KW drilling project of the Jimsar Oil Drilling Team in the Zhungeer Basin, Xinjiang, WP13 Premium Edition Series
![]() |
||
![]() |
![]() |
![]() |
The power station of the 5000KW drilling project of the Jimsar Oil Drilling Team in the Zhungeer Basin, Xinjiang, WP13 Premium Edition Series