Nanyang No.2 Oil Drilling Rig Project

Home / Application / Nanyang No.2 Oil Drilling Rig Project

Nanyang No.2 Oil Drilling Rig Project

May 23,2025

Location: Shaanxi 
Operating Environment: Temperature: -19°C~45°C,
Relative Humidity:<95% 
Installed Capacity:3x1000kW (two for one standby)
Unit Composition: 12M33 Engine+Hydraulic Power Transducer+Transmission Shaft+Split Gearbox;
Running Time: Maximum running time for a single unit is 500h. 