China Unicom (Qingdao) Smart Computing Center Backup Power Project Project
May 23,2025
Location: Qingdao
Operating environment: Temperature: 30°C~50°C;
Relative humidity:≤95%
Installed capacity: 6×2000kW (10.5kV, 50Hz)
Unit composition: 12M55 engine + 10.5kV generator;
Operating time: 2022.05